Perhaps I have something wrong in my log files. I'll check by hand. thanks. PS: I did a pull not long ago, and it pulled some files including the changes in the scheduler, but the pull did not include the fixes made by Presotto. Are you sure your pull does? Perhaps your pull includes just the changed scheduler, which was before the fixes.