From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: X-Spam-Checker-Version: SpamAssassin 3.1.3 (2006-06-01) on yquem.inria.fr X-Spam-Level: X-Spam-Status: No, score=0.1 required=5.0 tests=AWL autolearn=disabled version=3.1.3 X-Original-To: caml-list@yquem.inria.fr Delivered-To: caml-list@yquem.inria.fr Received: from mail2-relais-roc.national.inria.fr (mail2-relais-roc.national.inria.fr [192.134.164.83]) by yquem.inria.fr (Postfix) with ESMTP id 0A0FCBBAF for ; Fri, 10 Apr 2009 22:45:55 +0200 (CEST) X-IronPort-Anti-Spam-Filtered: true X-IronPort-Anti-Spam-Result: AlYBAKtM30nUnwckjmdsb2JhbACCIZQSAQEBAQkLCAkPBrQ5g3sG X-IronPort-AV: E=Sophos;i="4.40,169,1238968800"; d="scan'208";a="24380286" Received: from relay.ptn-ipout02.plus.net ([212.159.7.36]) by mail2-smtp-roc.national.inria.fr with ESMTP/TLS/RC4-SHA; 10 Apr 2009 22:45:54 +0200 X-IronPort-Anti-Spam-Filtered: true X-IronPort-Anti-Spam-Result: Ak4FADhM30nUnw6U/2dsb2JhbACCIckGg3sG Received: from fhw-relay07.plus.net ([212.159.14.148]) by relay.ptn-ipout02.plus.net with ESMTP; 10 Apr 2009 21:45:54 +0100 Received: from [87.112.6.57] (helo=leper.local) by fhw-relay07.plus.net with esmtp (Exim) id 1LsNbk-0007EH-44 for caml-list@yquem.inria.fr; Fri, 10 Apr 2009 21:45:52 +0100 From: Jon Harrop Organization: Flying Frog Consultancy Ltd. To: caml-list@yquem.inria.fr Subject: Re: [Caml-list] "ok with parallel threads" GC (aka ocaml for multicore) Date: Fri, 10 Apr 2009 21:52:26 +0100 User-Agent: KMail/1.9.9 References: <50CD0BA8-B89C-49E2-9082-FFA037F251A6@lip6.fr> In-Reply-To: <50CD0BA8-B89C-49E2-9082-FFA037F251A6@lip6.fr> MIME-Version: 1.0 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: 7bit Content-Disposition: inline Message-Id: <200904102152.26111.jon@ffconsultancy.com> X-Plusnet-Relay: e9187af3507e0dad964a86c9350976e9 X-Spam: no; 0.00; ocaml:01 ocaml:01 2009:98 frog:98 threads:01 wrote:01 caml-list:01 aka:04 parallel:05 benchmarks:07 written:07 batteries:91 release:09 release:09 thus:10 On Friday 10 April 2009 18:04:12 Philippe Wang wrote: > We should make a release soon, but before: > - some code has to be cleaned > - some benchmarks have to be done > - some documentation has to be completed > - an installation script still has to be written. > Thus not a lot is left to do before the release :-) This is the best news I've heard since OCaml 3.11 made it into testing and Batteries went into beta! -- Dr Jon Harrop, Flying Frog Consultancy Ltd. http://www.ffconsultancy.com/?e